The membrane is all that stands between a shower and the timber around it, and it disappears under tiles within days.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Berwick membrane checks have found a void at the back of a shower niche, a puncture in a shower base and detailing that falls short of AS 3740:2021. All are minutes to fix before tiling and a demolition job after.

Annotated findings from Waterproofing inspections.




1Bored piersHoles bored and cages set, before any concrete
2Slab pre-pourPre-pour, with pods, steel and formwork still open
3FrameFrame and trusses up, roof on, wraps not yet fitted
4Lock-up (pre-plaster)Windows, cladding and external doors in, before plaster
5FixingJoinery, doors and trims in, painter booked next
7Pre-handover (PCI)Around a week before practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
At handover the membrane is under tiles. The only way to check it then is to lift them.
A strip or bandage at joints and penetrations that lets the membrane flex without tearing.
AS 3740 for wet areas, with the Guide to Standards and Tolerances 2015 for finished work.
No. The inspection is visual, by hand and by moisture meter where useful.
Yes, where the membrane is exposed, including puddle flanges at outlets.
Usually the same day, so the tiler can be held back if needed.