Slab pre-pour inspection in Berwick

A slab is checked once, in the hours before the pour. After that, the steel, the pipes and the barrier underneath are sealed in concrete for good.

  • Pre-pour, with pods, steel and formwork still open
  • About 1 hour on site
  • Report within 24 hours
Request your quoteSend your details and a Berwick inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookPre-pour, with pods, steel and formwork still open
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Berwick slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Berwick builds

On Berwick waffle slabs we keep recording the same group of items: steel too close to the form face, mesh touching service pipes, bar chairs missing and beams narrowed where pods were knocked out of place.

What we find at this stage in Berwick

  • Concrete cover to steel too small
  • Mesh touching service pipes
  • Bar chairs missing under reinforcement
  • Beam width below the plans
  • Vapour barrier joints left open
  • Mesh sagging between supports
Vapour barrier joints left unsealed, giving ground moisture a way up, found during a slab pre-pour inspection in Berwick
Vapour barrier joints left unsealed, giving ground moisture a way up
Sample findings

Sample defects found during our slab pre-pour inspections in Berwick

Annotated findings from Slab pre-pour inspections.

Steel sitting too close to the form face, short of the concrete cover required, found during a slab pre-pour inspection in Berwick
Steel sitting too close to the form face, short of the concrete cover required
Mesh touching a service pipe where 25mm of clearance is needed, found during a slab pre-pour inspection in Berwick
Mesh touching a service pipe where 25mm of clearance is needed
Reinforcement resting low because bar chairs were missing beneath it, found during a slab pre-pour inspection in Berwick
Reinforcement resting low because bar chairs were missing beneath it
Beam narrowed where pods had shifted, below the width shown on the plans, found during a slab pre-pour inspection in Berwick
Beam narrowed where pods had shifted, below the width shown on the plans

The other stages of a Berwick build

  1. Bored piers inspection in Berwick1Bored piersHoles bored and cages set, before any concrete
  2. Frame inspection in Berwick3FrameFrame and trusses up, roof on, wraps not yet fitted
  3. Lock-up (pre-plaster) inspection in Berwick4Lock-up (pre-plaster)Windows, cladding and external doors in, before plaster
  4. Fixing inspection in Berwick5FixingJoinery, doors and trims in, painter booked next
  5. Waterproofing inspection in Berwick6WaterproofingMembrane applied and cured, tiler not yet started
  6. Pre-handover (PCI) inspection in Berwick7Pre-handover (PCI)Around a week before practical completion

All construction stage inspections in Berwick →

Guides

Construction stage guides for Berwick

All guides →

Book a slab pre-pour inspection in Berwick

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Berwick: common questions

What is concrete cover?

It is how much concrete sits between the reinforcement and the outer face of the slab. Too little and the steel can rust and burst the concrete over time.

Why can't mesh touch a pipe?

A 25mm gap lets concrete fully surround both. Contact leaves a weak spot and a route for corrosion.

What do bar chairs do?

They hold the steel at the right height so it sits where the engineer placed it in the slab depth.

Do you check termite protection at slab stage?

We look for collars and barriers at penetrations and whether the durable notice is in the meter box.

Can you come after the pour?

Yes, but most of what matters is then hidden. Pre-pour is the useful visit.

How fast is the report?

Same day in most cases, so the builder can act before the concrete arrives.